top of page



Toasty Asana Carlisle – Design Blog 006
The last week of construction is complete… and I am full of emotions. Having worked in the architectural industry for the last two decades, the studio’s construction phase was something that felt comfortable and familiar. Sprinklers need to be redone? Sounds about right. Reception desk stuck on a boat in the Pacific? Don’t worry about it. But this last week of construction has been something different entirely. It’s been a wave of emotions. This dream is now tangible — and I
vanordenelizabeth
Mar 292 min read


Toasty Asana Carlisle – Design Blog 005
Here we are in Week Six of construction — and the studio has walls! But more than walls, the studio is finally starting to feel warm to us. Yes, partly because the infrared panels and beautiful lighting are now installed, but also because this dream of creating a warm, safe, and inviting place for people to come and fall in love with yoga is beginning to feel real. Over the past two weeks, so much infrastructure has been installed — all the parts and pieces that will make thi
vanordenelizabeth
Mar 82 min read


Toasty Asana Carlisle – Design Blog 002
An update on our studio build out progress!
vanordenelizabeth
Jan 122 min read
bottom of page
