top of page


About Toasty


Toasty Class Development: Introducing Power + Play
We have been open for six weeks now, and already I’m seeing something inspiring take root in our students. There is a real desire to grow. Students are asking thoughtful questions, showing curiosity about more challenging postures, and looking for ways to deepen their practice beyond simply moving through a class. That has put me in a reflective mode as I think back on my own yoga journey. For much of the last 20 years, yoga was something I did because I knew it was good for
vanordenelizabeth
May 172 min read


Toasty Asana Carlisle – Design Blog 006
The last week of construction is complete… and I am full of emotions. Having worked in the architectural industry for the last two decades, the studio’s construction phase was something that felt comfortable and familiar. Sprinklers need to be redone? Sounds about right. Reception desk stuck on a boat in the Pacific? Don’t worry about it. But this last week of construction has been something different entirely. It’s been a wave of emotions. This dream is now tangible — and I
vanordenelizabeth
Mar 292 min read


Toasty Asana Carlisle – Design Blog 005
Here we are in Week Six of construction — and the studio has walls! But more than walls, the studio is finally starting to feel warm to us. Yes, partly because the infrared panels and beautiful lighting are now installed, but also because this dream of creating a warm, safe, and inviting place for people to come and fall in love with yoga is beginning to feel real. Over the past two weeks, so much infrastructure has been installed — all the parts and pieces that will make thi
vanordenelizabeth
Mar 82 min read


Toasty Asana Carlisle - Design Blog 004
We’re officially in Week Four of construction — and while the space still looks a little rough around the edges, there’s a whole lot of progress happening behind the scenes. After demo ended, the construction team dived into building all the infrastructure that is going to be supporting Toasty’s operations. Getting the HVAC systems (yes, we have multiple) reconfigured and in place, trenching so that our plumbing can get shifted, and spreading out more conduit than I think 12
vanordenelizabeth
Feb 232 min read


Toasty Asana Carlisle - Design Blog 003
When I say we’ve been busy… we have been busy . Most notably is that our construction has started. We’re having fun with it, but we’re also so thankful we aren’t the ones doing the work (we have video proof that we tried , though). Below are some photos from our day one of construction, plus a little reminder of where we started and where we are going. Let's start with a reminder of what we started with: And here's where we were during day one demo: Lastly, a reminder of
vanordenelizabeth
Feb 21 min read


Toasty Asana Carlisle – Design Blog 002
An update on our studio build out progress!
vanordenelizabeth
Jan 122 min read


Welcome to Toasty Asana Carlisle – Design Blog 001
We’ve been busy over here at Toasty Asana – and we are thrilled to finally share a peek at where things are headed! Our lease is officially signed, the design has been envisioned and stamped, equipment orders are underway, and once our permits are finalized… the sledgehammers will start swinging . This project has been years in the making, and seeing our ideas turn into real drawings and plans has been surreal. What was once an unused space sitting quiet for several years is
vanordenelizabeth
Nov 26, 20252 min read


My Journey to Toasty Asana
How Toasty Asana hot yoga came to be in Carlisle, PA
vanordenelizabeth
Oct 3, 20254 min read
bottom of page
